Please ask your agent for Hud fair market rents. 1. **Exterior**: - Painted aluminum exterior in white has been applied. 2. **Roof**: - A new roof has been installed. 3. **Windows**: - All windows are in place but need repairs. - Replace any broken or cracked panes as required. 4. **Drywall**: - Existing drywall requires additional spackling. - New drywall is needed in specific areas before sanding and final painting. 5. **Electrical**: - New electrical panel and service have been added to the property. - Electrical wiring still needs to be connected and run throughout the building to meet updated standards. 6. **Plumbing & HVAC**: - New plumbing and HVAC systems are required to bring the property up to standard. 7. **Interior Finishes** (Remaining Work): - Cosmetic finishes, including flooring installation and spackling. - Painting touch-ups as needed after drywall and spackling are complete. - Fix and replace broken windows as necessary. - Install cabinets in the kitchen.
S1576491
Residential Income - Multi-Family, 2 Story
4
2 Full
1910
Onondaga
0.0838
Acres
Public Water
2
Metal Siding, Aluminum Siding, Steel Siding
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...